EN | FR | NL

Beam Dump 5.9 MeV

The 100 Mev LINAC at SCK•CEN is engineered in phases. The initial Phase, called MINERVA, covers the first parts of the injector up to 5.9 MeV. This first part of the Injector will be equipped with a Beam Dump at the end of the beam line. Purpose of this tender is to manufacture and deliver one Beam Dump.

Come and work at MYRRHA

Would you like to be part of making this innovative and challenging research installation a reality? We need bright people with a scientific, operational and international background who are full of enthusiasm and who believe in the future of what we are doing. Join the MYRRHA team!

Discover our jobs